Highway Garage, Phases I and II
After providing civil engineering and surveying services for the construction of the highway garage for the Village of Wappingers Falls, KC provided environmental engineering services for the 0.9-acre Highway Garage site. KC’s services consisted of a Phase I Environmental Site Assessment (ESA) and a Phase II Subsurface Investigation (SI) including a geophysical survey; advancement of soil borings; installation of temporary groundwater monitoring wells and soil vapor probes; and collection of soil, groundwater, soil vapor, and air samples. KC’s findings were documented in a Phase II Subsurface Investigation Report.