Water System Capital Improvements Master Plan
KC was tasked with preparing a water system master plan for the Town of Wallkill with a specific focus on capital improvements and assessing the financial condition of the system as a whole. The Town of Wallkill water system consists of 3 water treatment plants, 8 water storage tanks, and more than 75 miles of water distribution piping that was in place before the water system was consolidated. The system produces and distributes an average of over 800M gallons of water every year. KC archived, cataloged, and analyzed over 1,000 plans and as-built drawings that were available for the water system to determine the condition of the facilities and the age, size, and material of the water distribution system. The end result provided information on over 99% of the water system assets.
KC was tasked with preparing a water system master plan for the Town of Wallkill with a specific focus on capital improvements and assessing the financial condition of the system as a whole. The Town of Wallkill water system consists of 3 water treatment plants, 8 water storage tanks, and more than 75 miles of water distribution piping that was in place before the water system was consolidated. The system produces and distributes an average of over 800M gallons of water every year. KC archived, cataloged, and analyzed over 1,000 plans and as-built drawings that were available for the water system to determine the condition of the facilities and the age, size, and material of the water distribution system. The end result provided information on over 99% of the water system assets.