Sewer Rehabilitation
Based on an in-depth sewer inspection project completed in the fall of 2015, the Tri-Municipal Sewer Commission (TMSC) tasked KC with providing detailed engineering design and construction packages for rehabilitation. The first project was for the rehabilitation of affected sewer segments and the second one for corroded manholes.
For the sewer rehabilitation project, it was determined that 4 separate work areas were involved within the 15,000 feet sewer main system. KC promptly completed a design to return the affected sewer segments to their original service condition.
Based on an in-depth sewer inspection project completed in the fall of 2015, the Tri-Municipal Sewer Commission (TMSC) tasked KC with providing detailed engineering design and construction packages for rehabilitation. The first project was for the rehabilitation of affected sewer segments and the second one for corroded manholes.
For the sewer rehabilitation project, it was determined that 4 separate work areas were involved within the 15,000 feet sewer main system. KC promptly completed a design to return the affected sewer segments to their original service condition.