Contract GI-DCM-TOC-5: Green Infrastructure Bowery Bay
The head of KC’s geotechnical engineering group worked on this New York City Economic Development Corporation (NYCEDC) project as an employee of another firm. The geotechnical scope included performing geotechnical investigations and evaluations, planning, and project management services. The project also included full-time site supervision of a subsurface investigation program, which included more than 600 borings for proposed right-of-way (ROW) bioswales; in-situ permeability testing and laboratory testing of collected soil samples; evaluation of permeability parameters at 5- and 10-feet below ground elevation; engineering support services; review of existing documents and boring information as obtained from other agencies; Sanborn map review; and preparation of a geotechnical data report upon completion of the subsurface investigation.
The head of KC’s geotechnical engineering group worked on this New York City Economic Development Corporation (NYCEDC) project as an employee of another firm. The geotechnical scope included performing geotechnical investigations and evaluations, planning, and project management services. The project also included full-time site supervision of a subsurface investigation program, which included more than 600 borings for proposed right-of-way (ROW) bioswales; in-situ permeability testing and laboratory testing of collected soil samples; evaluation of permeability parameters at 5- and 10-feet below ground elevation; engineering support services; review of existing documents and boring information as obtained from other agencies; Sanborn map review; and preparation of a geotechnical data report upon completion of the subsurface investigation.