Design-Build Contract D900034: Region 8 Bridge Replacement
This New York State Department of Transportation (NYSDOT) design-build project included the full replacement of two bridges: BIN 1040750 NYS Route 209 (3-span continuous steel girder bridge with a total span of 402 feet) over Rochester Creek and BIN 1019700 NYS Route 28 (7- span continuous steel girder bridge with a total span of 994 feet) over Esopus Creek. KC performed the structural design of the two structures, geotechnical work, environmental permitting, surveying, roadway design, and hydraulic analysis. KC was the Lead Designer and Quality Manager and our team was the Best Value selection – we had the highest technical score and our overall technical and cost score was 100. This project was completed one month ahead of schedule.
This New York State Department of Transportation (NYSDOT) design-build project included the full replacement of two bridges: BIN 1040750 NYS Route 209 (3-span continuous steel girder bridge with a total span of 402 feet) over Rochester Creek and BIN 1019700 NYS Route 28 (7- span continuous steel girder bridge with a total span of 994 feet) over Esopus Creek. KC performed the structural design of the two structures, geotechnical work, environmental permitting, surveying, roadway design, and hydraulic analysis. KC was the Lead Designer and Quality Manager and our team was the Best Value selection – we had the highest technical score and our overall technical and cost score was 100. This project was completed one month ahead of schedule.