Contract 59530001: Stapleton Waterfront Development

The head of KC’s geotechnical engineering group worked on this New York City Economic Development Corporation (NYCEDC) project as an employee of another firm. The geotechnical scope included geotechnical investigation, settlement analysis, and slope stability analysis along the shoreline; evaluation of subsurface soil conditions and soil conditions along the proposed bulkhead; determination of design soil parameters for pavement structure; and development of recommendations for the foundations of proposed structures and stabilization.