Contract D037956: Bridge Rehabilitation of Route 9 Over Wappinger Lake
This bridge rehabilitation project involved a complete replacement of a 213-foot double-span reinforced concrete beam structure. The new bridge has 11 metalized steel girders, new bearings, and a reinforced concrete deck. Due to the nature of the new roadway elevation, new drainage, curbs, guiderails, and asphalt roadway were installed. KC performed construction inspection of Stages 1 and 2, which consisted of 4 of the 11 new steel girders and a new 33-foot-wide concrete deck on the west side of the structure. Stage 3 included demolition and installation of 4 girders on the east side of the bridge.
This bridge rehabilitation project involved a complete replacement of a 213-foot double-span reinforced concrete beam structure. The new bridge has 11 metalized steel girders, new bearings, and a reinforced concrete deck. Due to the nature of the new roadway elevation, new drainage, curbs, guiderails, and asphalt roadway were installed. KC performed construction inspection of Stages 1 and 2, which consisted of 4 of the 11 new steel girders and a new 33-foot-wide concrete deck on the west side of the structure. Stage 3 included demolition and installation of 4 girders on the east side of the bridge.