Contract D038105: Rehabilitation of Brooklyn-Queens Expressway (BQE) Viaduct
The project involved rehabilitation of a viaduct on the BQE over 47th Street, running over Laurel Hill Boulevard from 47th Street to 58th Street, and work on a 45-span bridge. KC performed design survey and mapping, including base and supplemental mapping; topographic field survey of roadway, approach, and bridge superstructure and substructure elevations; geotechnical survey of soil borings and underground utility surveys; and ROW surveying, mapping, and analysis. KC produced draft and final design survey reports, CADD files, base mapping reports, and ROW mapping reports.
The project involved rehabilitation of a viaduct on the BQE over 47th Street, running over Laurel Hill Boulevard from 47th Street to 58th Street, and work on a 45-span bridge. KC performed design survey and mapping, including base and supplemental mapping; topographic field survey of roadway, approach, and bridge superstructure and substructure elevations; geotechnical survey of soil borings and underground utility surveys; and ROW surveying, mapping, and analysis. KC produced draft and final design survey reports, CADD files, base mapping reports, and ROW mapping reports.