Contract D037949-04: Route 94 and 17A Pavement Improvements

The project scope included the preliminary design services required for the improvement of 21 locations along the Route 94 and 94 / 17A corridor. The scope of work included milling and overlay; sidewalk, intersection, and traffic signal improvements; embankment stabilization; culvert replacement; pavement settlement repairs; sight distance improvements; and miscellaneous drainage improvements. KC provided geotechnical engineering, including scoping analysis, and developed scoping alternatives, design alternatives, and the draft and final Design Approval Documents (DADs) for embankment stabilization at Route 94 and provided environmental services for all sites. Additionally, KC evaluated the alternatives with NYSDOT’s Preliminary Cost Estimating Tool (PCET).