KC evaluated the condition of the Tri-State Mall building and assessed corrective actions to take if required. KC also inspected concrete masonry where a gap between two structures was reported. Based on our inspection, we determined that the two structures had been built at different times. The gap was a result of freeze and thaw cycles. KC recommended the gap be filled to prevent air and water infiltration. The structure was determined to be sound.
KC evaluated the condition of the Tri-State Mall building and assessed corrective actions to take if required. KC also inspected concrete masonry where a gap between two structures was reported. Based on our inspection, we determined that the two structures had been built at different times. The gap was a result of freeze and thaw cycles. KC recommended the gap be filled to prevent air and water infiltration. The structure was determined to be sound.