Franny Reese Park

Project Info

  • Discipline

    Municipal Engineering

  • Additional Disciplines

    Civil Engineering, Land Development

  • Location

    Wappingers Falls, NY

The scope of construction work for this project included sawcut pavement and pavement, curbing, and sidewalk removal; reconstruction of existing concrete curb and sidewalks; installation of mechanically-stabilized retaining walls, fencing, and site lighting; and additional site development work.

KC provided area and initial site mapping, topographic survey and base mapping, asbestos report development, advancement of the conceptual plan and preparation of preliminary working drawings, State Environmental Quality Review (SEQR) support for buildout of the conceptual plan, preparation of an Environmental Assessment Form, and preparation of contractual bid documents and opinions of probable construction cost for bidding.