Michaelson Studios plans to revitalize the old City of Middletown train depot on Midland Avenue Extension by creating a new film and production studio. Due to the extremely high-power demands of the required lighting systems needed for the facility, KC was contracted to design the electrical supply connections to the utility provider.
KC prepared calculations and designs for connection of the 6,500 AMP 208 VAC 3-phase connection from the utility’s transformer to the power control center in the facility.
The service utilized multiple stages in transforming all of the available 2 Megawaits in power and distributing it to the entire facility. KC also prepared the utility application for the client and coordinated with Orange and Rockland Utilities, and performed the site utility survey.