Washingtonville Culvert and Drainage Improvements Project

The project scope included replacement of the undersized culvert under State Route 94 in Washingtonville, which was located directly east of the Ahern Boulevard and State Route 94 intersection.

KC was responsible for providing architectural and engineering design, bid phase, and construction administration and support services. The scope of work included field and right-of-way (ROW) surveying and base mapping, preparation of highway and bridge design packages, and project management for preparation of contract documents. KC also provided engineering consulting services, working with the Town and the New York State Department of Environmental Conservation (NYSDEC) to obtain the required permits.

During the construction phase of the project, KC provided construction inspection services to ensure contract compliance, design intent, quality of workmanship, and material acceptance. KC also prepared as-built drawings.


Washingtonville Culvert and Drainage Improvements

The project scope includes replacement of the undersized culvert under State Route 94 in Washingtonville, NY, which is located directly east of the Ahern Boulevard and State Route 94 intersection.

KC is responsible for providing architectural and engineering design, bid phase, and construction administration and support services. The scope of work includes field and right-of-way (ROW) surveying and base mapping, preparation of highway and bridge design packages, and project management for preparation of contract documents. KC is also providing engineering consulting services, working with the Town and the New York State Department of Environmental Conservation (NYSDEC) to obtain the required permits.

During the construction phase of the project, KC will provide construction inspection services to ensure contract compliance, design intent, quality of workmanship, and material acceptance. KC will also prepare as-built drawings.