Shoreline Protection Project

In order to satisfy the requirements of the New York State Department of Environmental Conservation (NYSDEC) State Pollutant Discharge Elimination System (SPDES) General Permit for Stormwater Discharges from Construction Activity, KC is preparing soil erosion and sediment control drawings and a Stormwater Pollution Prevention Plan (SWPPP) for the Governor's Office of Storm Recovery (GOSR). Our drawings demonstrate all soil and sediment controls to be implemented during construction to minimize the offsite discharge of pollutants.

Methods include the treatment of stormwater runoff, inlet protection, steep slope stabilization techniques, soil stockpile stabilization, and silt fences to abate air-born particulates from moving off-site. Our SWPPP provides water quality volume calculations, Stormwater Management Practices, and stormwater peak discharge offsite for both existing and proposed conditions to ensure that no net increase in runoff occurs.